What is the interior surface process?

This is the final phase of construction. Everything must be in perfect working condition before we apply the finish coat to the gunite finish. The finishing on your pool is very delicate and it is essential that everything must be in order so that we do not mar the beautiful surface of your pool.

When the plaster is complete, the crew will begin to fill your pool with water. DO NOT stop the flow of water until the pool is full until the water level is at the middle of the tile line. DO NOT turn the pool light on until the pool is full. DO NOT put any chemicals into your pool unless requested to do so by Paradise Pools™. When the water level is in the middle of the tile line, call Paradise Pools™ and the start-up of your pool will be scheduled.

A FEW IMPORTANT NOTES:

  • Do not swim in the pool until it is full
  • A garden hose must be present
  • Your pool can not be filled with soft water
  • Do not burn trash or leaves the day before that your pool is scheduled for plaster

PLEASE KEEP CHILDREN AND PETS AWAY FROM THE POOL CONSTRUCTION AREA.

(559) 635-9637