What happens during pool layout and excavation?

(PLEASE PARDON OUR DUST)


Pool excavation is a messy, dirty process that is exciting and unavoidable. Please be reminded that it is your responsibility to clear any planters, decorative rocks, sprinkler heads/lines etc. that may get in the way of the construction access.

An excavation crew carefully digs, forms and hand-trims your pool in precise accordance with every detail of your swimming pool's design specifications.

The excavation process usually only takes one day, however, it may take longer depending on the soil conditions or unexpected weather delays. We will be able to give you an estimate as to how long it will take and if there may be any additional charges should we encounter soil conditions.

You will note the wooden forms around your swimming pool. They are there to guide us in the rest of our construction, please do not tamper with these wooden forms.

The majority of dirt from the excavation process will be removed the day of the excavation. Don't be concerned if some dirt remains, as we will use this for other phases of the construction. If for some reason you would like a portion for landscaping purposes or some other uses, you must let us know where and how much you desire. Be cautioned that if you ask us to leave the dirt and then you decide you do not want to keep it, there will be an extra charge to bring the truck back to remove it.

A Paradise supervisor will be out within 48 hours to inspect the excavation and install a temporary fence across your open access area. It is at this time he will inform the coordinator to order plumbing, steel and electrical.

PLEASE KEEP CHILDREN AND PETS AWAY FROM THE POOL CONSTRUCTION AREA.

(559) 635-9637