What is the pool plumbing process?

Your Paradise Pool is now ready to be plumbed with high-grade National Sanitation Foundation approved "Scheduled 40" PVC pipe designed to prevent leaks or deterioration. All pipe connections are solidly bonded and the entire plumbing system is hydrostatically pressure tested.

Plumbing

As with every other stage of your new Paradise Pool, the plumbing is done in accordance with your pool design specifications and we insure the plumbing meets Paradise Pools™ rigid standards of quality and design.

In an earlier section you were given your pool design and plumbing schematics. If during the construction process you decide to make any changes, you will be given a new pool . design and plumbing schematics for you to use as a reference point during your orientation session.

PLEASE KEEP CHILDREN AND PETS AWAY FROM THE POOL CONSTRUCTION AREA.

(559) 635-9637